Camelback Storm Drain 59th Ave to 75th Ave

Project Type: Design Bid Build

Project Owner: Flood Control District of Maricopa County

Construction Dates: 7/10 to 7/11

The project consisted of installing 21,000 LF of RGRCP ranging in size from 102” to 18” down Camelback Road between 59th and 75th Avenues while maintaining two-way traffic on Camelback Road, a major thoroughfare. 120 catch basins were installed. Large diameter Junction Structures were installed at three major intersections, at depths of over 20’ during single weekend closures. Maintaining traffic while providing access to local residents and businesses was accomplished with timely and effective communication to all affected parties, and was achieved with a substantial public relations campaign. Miscellaneous work: structures, bypass pumping, paving, manholes, traffic control, landscaping, microseal, crackseal, sidewalk, curb and gutter, bus bay, driveways, manufactured CLSM.